Projects
ALTEA & GEOSTUDIO 2000 has participated in important national projects
Some Of The Projects

1. TAP Pipeline
1. Geological and geotechnical studies for the TAP Gas line: a) Studies on the stability of slopes, installation of equipment for monitoring the stability of slopes b) Geological-engineering and geotechnical studies for the roads connecting the gas line with the existing roads c) Geological-engineering and geotechnical studies for areas with liquefaction potential d) Geological-engineering studies for compressor stations e) Monitoring of slope stability in weak areas with mountainous relief along the line
2. HEC Banja & Moglica
Geological-engineering and geotechnical studies for various hydropower facilities in the Devoll valley. Technical assistance during the implementation of construction works, quality control of materials and quality of construction during the construction of connecting roads in the Devoll valley.


3. HEC Fan
Technical assistance during the implementation of construction works, quality control of materials and quality of construction in hydropower plants that are being built in the valley of the river Fan, in Mirdita Geological-engineering and geotechnical studies of some hydropower plants on the river Fan, in the district of Mirdita
4. Bypass of Fier & Vlora


5. Railways Tirana-Durrës, Durrës-Rrogozhinë, Vora-Hani I Hotit
6. Electricity line Babicë-Saranda, Vau I Dejës-Morinë, Ersekë-Përmet-Korçë


7. hEC Skavica
8. Agricultural Dam Fier-Berat, Korça, Kukës


9. Wastewater Treatment Plants In Velipoja, Vlora, Orikum, Ksamil
10. Nation's road


11. bypass Tirana
12. Various Electrical Stations


13. Kosovo Power Plant
14. Vlora Airport


15. Karavasta Photovoltaic Plant
16. Reconstruction Zones After the Earthquake of November 26, 2019 In Durrës, Shijak, Kavaja, Laç

